A boring that cannot be reached cannot be drilled. The access study answers four questions for each boring: how does the rig get there, what has to be cleared, crossed or protected on the way, whose land is it on, and what approvals are needed. It is built from the desktop study (Chapter 3.2), walked and flagged during the reconnaissance (Chapter 3.4), and priced in the cost estimate (Chapter 3.7).