↑ Parent Menu⌂ Main Menu
← Appendices A–C Appendices
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

Author and Sources

Reference templates and boilerplate specification language (Appendices A–C).
Authors: Daniel P. Colwell and Mario Ruel
Author and Sources

Authors: Daniel P. Colwell and Mario Ruel. This part was written and compiled by Daniel P. Colwell and Mario Ruel for Railway Ground Hazard Risk Management.

Technical content is drawn from the published sources below, and credit for that material belongs to their authors and publishers. Tables, equations and figures taken from a specific source are also cited where they appear.

Sources

  • Appendices A–C: templates and Geotechnical Special Provision language prepared for this manual; test standards cited within each template (ASTM, AASHTO, AREMA MRE).Official page ↗

Project management sources

  • Twort, A. C., and Rees, J. G. (2004). Civil Engineering Project Management, 4th ed. Oxford: Elsevier Butterworth-HeinemannFind source ↗
  • ASCE Construction Institute Committee on Specifications (L. Eckersley, Chair) (2013). Preparation of Construction Specifications for Civil Projects. Reston, VA: American Society of Civil EngineersFind source ↗
  • Seeley, I. H. (1993). Civil Engineering Quantities, 5th ed. Basingstoke: The Macmillan PressFind source ↗
  • Levy, S. M. (2010). Construction Process Planning and Management: An Owner’s Guide to Successful Projects. Burlington, MA: Butterworth-Heinemann (Elsevier)Find source ↗
  • Goldbloom, J. (1989). Engineering Construction Specifications: The Road to Better Quality, Lower Cost, Reduced Litigation. New York: Van Nostrand ReinholdFind source ↗Library entry
← Previous · 8.0 Reporting Chapter 8.4 — Geotechnical Report Preparation
Next · Appendices → Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit