↑ Parent Menu⌂ Main Menu
← Appendices A–C Appendices
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

APPENDIX B — LABORATORY TEST RESULTS TABLE TEMPLATE

Reference templates and boilerplate specification language (Appendices A–C).
Authors: Daniel P. Colwell and Mario Ruel
APPENDIX B — LABORATORY TEST RESULTS TABLE TEMPLATE

↗ Open printable laboratory results template (letter landscape)

GHRM
Appendix B · Laboratory TestingSummary of Laboratory Test Results
Lab report no.LR-001
ProjectExample Siding Extension — Embankment WideningProject no.000000.00Client railroad[Railroad]Report date__/__/____
Laboratory[Laboratory name]Accreditation[e.g., AASHTO re:source; USACE]Tested by[Name]Reviewed by[Name], P.E.
Test results EXAMPLE ENTRIES
Table B-1. Index properties and classificationUSCS per ASTM D2487; NP = non-plastic
BoringSampleDepth
(ft)
USCSGradation (D6913 / D1140)Atterberg limits (D4318)w
(%)
γd
(pcf)
GsTests / remarks
Gravel %Sand %Fines %LLPLPI
B-1SS-12.5–4.0SM27127NPNPNP12.4——D2216, D6913
B-1SS-37.5–9.0CL0188242202224.1——D2216, D4318, D1140
B-1ST-110.0–12.0CH089268284038.578.2—D2216, D4318, D7263
B-3ST-118.0–20.0CH069471294242.176.52.72D854, D2435
Tests for Soil
Tests for Soil
Soil Index Properties
Soil Index Properties
Table B-2. Strength and compressibilityReport specimen quality (Δe/e0) for each undisturbed specimen
BoringSampleDepth
(ft)
Test
(ASTM)
UndrainedEffective stressConsolidation (D2435)Remarks
su (tsf)εf (%)c′ (psf)φ′ (°)CcCrσ′p (tsf)cv (ft²/day)Cα
B-1ST-110.0–12.0D2850 (UU)0.24————————σ3 = 0.5 tsf
B-3ST-118.0–20.0D2435————0.590.141.500.15—Casagrande σ′p
B-6ST-112.0–14.0D4767 (CU)——20031—————3-point, with pore pressure
Table B-3. Compaction, CBR and resilient modulusRC = relative compaction
Source /
location
MaterialTest
(ASTM)
Moisture–densityBearing / stiffnessRemarks
γd,max (pcf)wopt (%)EffortSoaked CBR (%)Swell (%)Mr (psi)
Borrow-1CL fillD1557118.214.0Modified24.3——CBR at 95% RC, 96-hr soak (D1883)
Borrow-2SM fillD1557126.510.5Modified51.8——CBR at 95% RC, 96-hr soak (D1883)
TP-3 subgradeCL naturalD1557116.815.2Modified12.6—4,200Mr at 95% RC (AASHTO T 307)
Notes
  1. “—” = test not performed. Blank rows are provided for additional samples.
  2. Test methods: moisture D2216; gradation D6913 / D1140; Atterberg limits D4318; specific gravity D854; unit weight D7263; UU triaxial D2850; CU triaxial D4767; consolidation D2435; compaction D698 / D1557; CBR D1883; resilient modulus AASHTO T 307.
  3. Report the ASTM edition used and any deviations from the standard. Individual test data sheets and curves are attached behind this summary.
  4. Results apply only to the samples tested.
Tested by / dateLaboratory manager / dateReviewed by (P.E.) / dateQC duplicate check (10%)
Appendix B — Laboratory Test Results Table TemplateRailway Ground Hazard Risk Management · Geotechnical EngineeringSheet ___ of ___
← Previous · 8.0 Reporting Chapter 8.4 — Geotechnical Report Preparation
Next · Appendices → Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit