↑ Parent Menu⌂ Main Menu
← Appendices A–C Appendices
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

Empirical Equations — Use and Limitations

Reference templates and boilerplate specification language (Appendices A–C).
Authors: Daniel P. Colwell and Mario Ruel
Empirical Equations — Use and Limitations

The correlations used in this chapter are listed below. Each gives an estimate, not a test result. The full equation, variables, range of applicability, constraints and source for each one, and the note to record whenever one is used, are in the Empirical Equations & Correlations reference.

IDCorrelationGives
IS-01SPT energy & procedure correctionN₆₀
RK-10UCS from point load indexσ꜀
IS-02SPT overburden normalization (sands)(N₁)₆₀
← Previous · 8.0 Reporting Chapter 8.4 — Geotechnical Report Preparation
Next · Appendices → Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit