↑ Parent Menu⌂ Main Menu
← Appendices A–C Appendices
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

01.2 Materials.

Reference templates and boilerplate specification language (Appendices A–C).
Authors: Daniel P. Colwell and Mario Ruel
01.2 Materials.
  • Structural fill (Type A): Select borrow meeting ASTM D2487 classification SM, SC, ML, or CL; LL ≤ 40, PI ≤ 20; maximum particle size 3 in.; no organic material; free of frozen lumps, roots, or debris.
  • Embankment fill (Type B): Approved borrow not meeting Type A gradation but free of organics, frozen material, and particles > 6 in.; LL ≤ 50.
  • Blanket Layer (Type C): Granular material meeting USACE frost group NFS (non-frost-susceptible) or F1; maximum fines (% passing No. 200) ≤ 5%; no particles > 3 in.

01.3 Equipment. Compaction equipment to produce minimum modified Proctor density specified in Section 01.4. Compaction equipment shall not be operated within 5 ft of installed drainage pipe or within 3 ft of retaining wall or abutment face.

← Previous · 8.0 Reporting Chapter 8.4 — Geotechnical Report Preparation
Next · Appendices → Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit