8.1.2 When Exploration Is Enough

The difference between a subsurface exploration and a geotechnical investigation, what each one delivers, and why the client must know which it is buying.
Author: Daniel P. Colwell
8.1.2 When Exploration Is Enough

A data-only scope is the right choice when someone else will do the design, when the design is not yet defined, or when the data are needed to compare sites or alternatives before any one is chosen.

  • Competitive design or design-build, where several firms will use the same data.
  • Early-phase work, where alignment or grade may still change.
  • Data needed for a specialist (a pile designer, a pavement designer, a drainage engineer) who will interpret it.
  • Monitoring or verification programs (groundwater readings, instrumentation).
Say it plainly. A data report should state on its first page that it contains no interpretation or recommendations and should not be used for design without them.