8.1.0 Purpose and Overview

The difference between a subsurface exploration and a geotechnical investigation, what each one delivers, and why the client must know which it is buying.
Author: Daniel P. Colwell
8.1.0 Purpose and Overview

An exploration collects and presents subsurface data. An investigation collects the data and then interprets it, analyzes it and makes recommendations. The field work can be identical; the difference is in what the engineer does with the results and what the client may rely on. Confusing the two is a common source of disputes: a client who paid for borings expects design answers, or a contractor treats a data report as if it carried recommendations.

Exploration
Borings, samples, field tests, lab data, logs
▬▸
Interpretation
Profile, parameters, groundwater regime
▬▸
Analysis
Bearing, settlement, stability, seepage, pavement
▬▸
Recommendations
Design values, construction measures, special provisions

Exploration covers the first box. Investigation covers all four.