8.1.1 Definitions

The difference between a subsurface exploration and a geotechnical investigation, what each one delivers, and why the client must know which it is buying.
Author: Daniel P. Colwell
8.1.1 Definitions
Table 8.1-1. Exploration and investigation compared
ItemSubsurface explorationGeotechnical investigation
PurposeCollect and present factual dataAnswer the design question
Field and laboratory workBorings, sampling, field tests, laboratory testsSame, plus targeted tests chosen for the analyses
InterpretationNone, or limited to classificationGeologic interpretation, design parameters, groundwater regime
AnalysisNoneBearing capacity, settlement, slope stability, seepage, pavement, seismic as needed
RecommendationsNoneFoundation and earthwork recommendations; construction considerations; special provisions
DeliverableGeotechnical data report (Section 8.4.1.1)Geotechnical design or final report (Section 8.4.1.2); or a memorandum for a limited question
Who relies on itDesigners and bidders who will do their own interpretationThe designer and owner for the stated project
SealOften not sealed as designSealed by the responsible engineer where required