Chapter 5.4 — Geo-Environmental Testing on Railroad Corridors

What contaminants to expect in railroad ground, how to sample for them during a geotechnical program, and how to manage drilling waste and spoil.
Author: Daniel P. Colwell

Railroad corridors carry a long history of activities that leave chemicals in the ground: creosote-treated ties, herbicide spraying, coal and cinder handling, fueling, locomotive servicing and spills. A geotechnical investigation does not need to be an environmental site assessment, but it does need to know what it may encounter, how to protect the crew, how to handle cuttings and water, and when to collect samples that will save a second mobilization. This chapter covers those questions.

Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
5.4.0 Purpose and Overview

Geo-environmental testing on a geotechnical project serves three purposes: protecting workers and the public during drilling and excavation; classifying soil, ballast and water that will be removed so they can be reused or disposed of properly; and flagging conditions that need a formal environmental assessment. Each has a cost; the aim is to collect the minimum data that answers the question, at the same time as the geotechnical work.

5.4.1 Contaminants Typical of Railroad Corridors
Table 5.4-1. Contaminants commonly associated with railroad activities
SourceTypical contaminantsWhere found
Treated crossties and timber structuresCreosote compounds (PAHs), pentachlorophenolBallast and shoulder soils along all tracks; tie storage sites
Herbicide applicationArsenic (historical), other herbicidesBallast and shoulders; highest on older lines
Coal, cinders and ashPAHs, metals (arsenic, lead), sulfateOld ballast sections, coaling stations, embankment shoulders
Fueling and servicingPetroleum hydrocarbons, BTEX, lubricants, solventsYards, fueling racks, engine houses
Electrical equipmentPCBs (older transformers)Substations, signal houses (older)
Spills and car leaksProduct-specificSidings, interchange and industrial tracks
Adjacent land useVariesIndustry, landfills, agriculture

Ballast and the upper few feet of shoulder soil along mainline track commonly contain PAHs and metals above residential screening levels, which affects where excavated material can go even when it poses no special risk on the right-of-way.

5.4.2 The Environmental Assessment Framework
Table 5.4-2. Environmental assessment stages
StageStandardContentRelation to geotechnical work
Phase I environmental site assessmentASTM E1527Records review, site visit, interviews; identifies recognized environmental conditionsShares sources with the geotechnical desktop study (Chapter 3.2)
Phase II environmental site assessmentASTM E1903Sampling and analysis to confirm or rule out conditionsBorings can be shared; samples collected and preserved differently
Waste characterizationDisposal facility and state requirementsAnalysis of soil, ballast or water for disposal acceptanceUsually needed for excavation spoil and drilling waste

Geotechnical staff should not represent field screening as an environmental assessment. Where screening finds evidence of contamination, the finding is reported to the project manager and client for decision, and a qualified environmental professional takes over.

5.4.3 Field Screening and Worker Protection
  • Review the desktop study for yards, fueling, spills and adjacent industry before drilling; write a site health and safety plan that names the expected contaminants.
  • Screen cuttings and samples with a photoionization detector (PID) and note odor, staining and sheen on the logs.
  • Set action levels in the safety plan (PID readings that trigger respiratory protection or stopping work).
  • Use nitrile gloves for sample handling in ballast and shoulder soils as a routine.
  • Decontaminate drilling tools between borings where contamination is suspected, so material is not carried down the hole.
  • Seal borings with grout where they penetrate a confining layer beneath contaminated ground.
5.4.4 Sampling During Geotechnical Work

If analysis is likely, collect samples during the geotechnical borings rather than remobilizing. Environmental samples need different handling from geotechnical samples:

  • Laboratory-supplied clean jars with preservatives as required; volatile samples collected promptly with minimal disturbance.
  • Cooling to about 39°F (4°C) and chain-of-custody documentation from collection to the laboratory.
  • Holding times: some analyses must start within days; coordinate with the laboratory before mobilizing.
  • Composite samples for waste characterization (for example, one composite per stockpile volume specified by the receiving facility).

Analysis packages commonly used for railroad spoil are total petroleum hydrocarbons, PAHs, metals and, for disposal, the leaching procedure required by the receiving facility. The laboratory testing program is covered in Chapter 5.2.

5.4.5 Investigation-Derived Waste and Spoil

Drilling generates cuttings, drilling fluid and decontamination water. On railroad property these are usually containerized (55-gallon drums) where contamination is possible, then characterized and disposed of. The number of drums is a cost and logistics item that should be in the estimate.

Vc = (π D2 / 4) L n fb(Eq. 5.4-1)
Volume of cuttings: D = hole diameter; L = boring depth; n = number of borings; fb = bulking factor (about 1.2 to 1.3).
Ndrums = Vc / (7.35 cf × fill fraction)(Eq. 5.4-2)
A 55-gallon drum holds 7.35 cf; fill to about 80% to allow handling and closing.

Excavation spoil, fouled ballast and ditch cleanings removed during construction follow the same logic at larger scale: characterize, then reuse on the right-of-way where allowed, or dispose of at a facility that accepts the material. Including the characterization in the geotechnical program avoids delays when the contractor starts excavating.

5.4.6 Worked Example
The example uses a generic site and is not taken from any client project. It follows the five-part format.
Example 5.4-1: Drums of Drilling Waste for a Yard Investigation

Twenty borings, each 30 ft deep, are planned with hollow-stem augers in a rail yard with a history of fueling. The owner requires all cuttings to be drummed and characterized before disposal.

Given

VariableValueDescription
n20Number of borings
L30 ftDepth of each boring
D8 in. (0.667 ft)Outside diameter of the auger flights (hole diameter)
fb1.25Bulking factor for cuttings
Drum55 gal = 7.35 cf, filled to 80%Usable volume 5.88 cf per drum

Required

  • Volume of cuttings
  • Number of drums to carry in the estimate

Equations

  1. Eq. 5.4-1: Vc = (πD2/4) L n fb — cuttings volume
  2. Eq. 5.4-2: N = Vc / (7.35 × 0.8) — drums

Steps

Step 1 · Hole area
π (0.667)2 / 4
A = 0.349 sq ft
Spot check: An 8-in. circle is about a third of a square foot.
↓
Step 2 · In-place volume
0.349 × 30 ft × 20 borings
209 cf
Spot check: About 10.5 cf per boring.
↓
Step 3 · Bulked volume
209 × 1.25
Vc ≈ 262 cf
↓
Step 4 · Drums
262 / (7.35 × 0.8) = 262 / 5.88
44.5, use 45 drums
Spot check: About 2.2 drums per boring; at roughly 2 drums per 30-ft boring this is reasonable.
↓
Solution
The borings will produce about 262 cf of bulked cuttings, requiring about 45 drums for cuttings alone, before decontamination water.

Solution

The borings will produce about 262 cf of bulked cuttings, requiring about 45 drums for cuttings alone, before decontamination water.

Carry about 50 drums in the estimate to cover decontamination water and the partly filled last drum at each location, plus one composite characterization sample per group of drums as the receiving facility requires. The drums also need a staging area on railroad property that is clear of tracks and accessible to the disposal contractor; include that in the access and right-of-entry planning.

If the yard history suggests petroleum only, ask the client whether cuttings from borings with clean PID readings can be spread on site. That decision can cut the drum count sharply, but it belongs to the client and its environmental staff, not to the drilling crew.

5.4.7 Cross-References

Related chapters in this manual:

Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.