8.3.4 Figures and Attachments

Short technical documents: when to write a memorandum instead of a report, how to structure it, and the review it needs before it goes out.
Author: Daniel P. Colwell
8.3.4 Figures and Attachments

Attach only what the reader needs to act: a boring location plan matched in style across figures, preliminary logs, a photo map with clickable photo locations, the revised RFP or estimate. Reference the files by name and location so the team can find the current version, and move superseded files out of the working folder so nobody uses them by mistake.

A typical reconnaissance photograph used in a field memo. One or two captioned photos in the memo, with the full set in a map file, usually says more than a photo appendix.
Figure 8.3-1. A typical reconnaissance photograph used in a field memo. One or two captioned photos in the memo, with the full set in a map file, usually says more than a photo appendix.