Table 8.3-1. Memorandum types| Type | Purpose | Typical length | Example |
|---|
| Project update memo | Record a change in scope, the reason and the effect | 1 to 3 pages | Borings added at one reach; RFP revised; estimate updated |
| Field or reconnaissance memo | Report what was found on a site visit | 1 to 2 pages plus photo map | Access, clearing, boring relocations, open items |
| Data transmittal | Send logs or laboratory data without interpretation | 1 page plus attachments | Preliminary boring logs for the designer |
| Technical memo | Answer one engineering question | 3 to 10 pages | Stability of steepened slopes at four reaches |
| Recommendation addendum | Add to or revise an issued report | 3 to 10 pages | Memorandum addendum to an earlier final geotechnical report, with new logs and quantities |
| Emergency assessment letter | Give a decision within a day or two of a failure | 2 pages plus photos and a sketch | See Section 8.4.1 |