8.3.3 Structure and Content

Short technical documents: when to write a memorandum instead of a report, how to structure it, and the review it needs before it goes out.
Author: Daniel P. Colwell
8.3.3 Structure and Content

A memorandum works when the reader gets the answer in the first paragraph. The structure below follows a project update memo used in practice.

Table 8.3-3. Memorandum structure
PartContent
Header blockPrepared by, date, project, client and project numbers, subconsultant and key dates
1. SummaryThe finding or decision and its effect, in a short paragraph
2. Finding or backgroundWhat was found and why it matters, in bullets
3. DetailsTables of borings, quantities, results; figures
4. ChangesWhat changed from the previous version (for revisions)
5. Cost or schedule effectNet change and new totals, where relevant
6. Files updatedWhere the revised documents and map files are saved
7. Open itemsWhat still needs a decision, and from whom
LimitationsWhat the memo is based on and what it does not cover

Write in plain sentences with short bullets. Give boring IDs, stations and dates exactly; round quantities sensibly; and keep observation, interpretation and recommendation in separate paragraphs.

Summary
Answer first
▬▸
Finding
What and why
▬▸
Details
Tables and figures
▬▸
Effect
Cost, schedule
▬▸
Open items
Who decides what