8.3.2 Memorandum or Report?

Short technical documents: when to write a memorandum instead of a report, how to structure it, and the review it needs before it goes out.
Author: Daniel P. Colwell
8.3.2 Memorandum or Report?
Table 8.3-2. Choosing the document
Choose a memorandum whenChoose a report when
The question is narrow (one reach, one structure, one decision)The project needs a complete record of conditions and recommendations
The audience is the project teamThe document will go to bidders, regulators or the public
The answer is needed in daysThere is time for full review
It adds to an issued reportIt replaces or stands alone
The content is a decision or a changeThe content is a design basis
A memorandum is still an engineering document. If it contains interpretation or recommendations, it carries the same responsibility as a report (Chapter 8.1) and gets the same technical review.