5.4.4 Sampling During Geotechnical Work

What contaminants to expect in railroad ground, how to sample for them during a geotechnical program, and how to manage drilling waste and spoil.
Author: Daniel P. Colwell
5.4.4 Sampling During Geotechnical Work

If analysis is likely, collect samples during the geotechnical borings rather than remobilizing. Environmental samples need different handling from geotechnical samples:

  • Laboratory-supplied clean jars with preservatives as required; volatile samples collected promptly with minimal disturbance.
  • Cooling to about 39°F (4°C) and chain-of-custody documentation from collection to the laboratory.
  • Holding times: some analyses must start within days; coordinate with the laboratory before mobilizing.
  • Composite samples for waste characterization (for example, one composite per stockpile volume specified by the receiving facility).

Analysis packages commonly used for railroad spoil are total petroleum hydrocarbons, PAHs, metals and, for disposal, the leaching procedure required by the receiving facility. The laboratory testing program is covered in Chapter 5.2.