Drilling generates cuttings, drilling fluid and decontamination water. On railroad property these are usually containerized (55-gallon drums) where contamination is possible, then characterized and disposed of. The number of drums is a cost and logistics item that should be in the estimate.
Excavation spoil, fouled ballast and ditch cleanings removed during construction follow the same logic at larger scale: characterize, then reuse on the right-of-way where allowed, or dispose of at a facility that accepts the material. Including the characterization in the geotechnical program avoids delays when the contractor starts excavating.