Review the desktop study for yards, fueling, spills and adjacent industry before drilling; write a site health and safety plan that names the expected contaminants.
Screen cuttings and samples with a photoionization detector (PID) and note odor, staining and sheen on the logs.
Set action levels in the safety plan (PID readings that trigger respiratory protection or stopping work).
Use nitrile gloves for sample handling in ballast and shoulder soils as a routine.
Decontaminate drilling tools between borings where contamination is suspected, so material is not carried down the hole.
Seal borings with grout where they penetrate a confining layer beneath contaminated ground.