Appendix A · Subsurface Exploration RecordBoring Log
Boring No.B-1
ProjectExample Siding Extension — Embankment WideningProject no.000000.00Client railroad[Railroad]Subdivision / MP[Sub.] MP 000.0
Station / offsetSta. 00+00, 25 ft Lt. of CL mainLatitude / longitude00.00000° / −00.00000°Ground surface elev. (ft)745.0 (NAVD 88)Total depth (ft)25.0
Drilling contractor[Contractor]Rig / methodTrack-mounted rig / 3¼-in. HSA; NX coreHammerAutomatic, 140 lb, 30 in. dropEnergy ratio (ER)55% (calibrated)
Date started / completed__/__/____  /  __/__/____Logged by[Name], [Title]Checked by[Name], P.E.Weather[Conditions]
Subsurface profile EXAMPLE ENTRIES
Elev.ftDepthftGraphic
log
SampleSPT (ASTM D1586)Material descriptionConsistency/density, color, moisture, SOIL NAME (USCS), other; geologic unitIndex testsRemarks /
lab tests
No.TypeRec.in.Blows /
6 in.
N60
01020304050
w%LL/PI−200%
745.00–2.5FILL — Silty SAND (SM), brown, moist; ballast fragments and cinders in upper 1 ft
742.52.5–4SS-1SS142-3-3
5.5
Loose, brown, moist, silty fine SAND with gravel (SM) — fill12.4w
740.05–6.5SS-2SS163-4-4
7.4
Medium dense, brown, moist, silty fine SAND (SM)10.8w
737.57.5–9SS-3SS182-2-2
3.7
ALLUVIUM — Soft, gray, wet, lean CLAY (CL)24.142/2282w, LL, PL, −200
735.010–12ST-1ST22pushSoft, dark gray, wet, fat CLAY (CH); LL = 68, PL = 2838.568/4092Consol. (D2435), UU (D2850), γd = 78.2 pcf
732.512.5–14SS-4SS181-1-2
2.8
Very soft, dark gray, wet, fat CLAY (CH)42.1w
730.015–16.5SS-5SS161-2-2
3.7
Soft to firm, gray, wet, fat CLAY (CH)36.8w
727.517.5–19SS-6SS153-4-4
7.4
RESIDUUM — Medium dense, red-brown, moist, clayey SAND (SC)9.2w
725.020–21.5SS-7SS176-8-10
16.6
Dense, red-brown, moist, clayey SAND (SC)8.1w
723.022–25RC-1NXREC 94%
RQD 78%
50/3″BEDROCK — Greenstone, hard, slightly weathered, gray-green; joints moderately close, rough, iron-stained. Auger refusal at 22.0 ft; cored 22.0–25.0 ftPoint load (D5731)
Boring terminated at 25.0 ft in bedrock · Backfilled with bentonite-cement grout
Groundwater observations
▽ Encountered during drilling8.0 ft (El. 737.0)▼ At completion of drilling7.2 ft (El. 737.8)
▼ Stabilized (24 hr after completion)6.8 ft (El. 738.2)Date / method__/__/____ · tape in open hole
Graphic log legend (after ASTM D2488)
Fill
Gravel (GW/GP)
Clean sand (SW/SP)
Silty sand (SM)
Clayey sand (SC)
Silt (ML/MH)
Lean clay (CL)
Fat clay (CH)
Peat / organic (Pt, OL/OH)
Bedrock
Sample and test key
SS · Split-spoon sample (ASTM D1586)ST · Shelby tube (ASTM D1587)NX / HX · Rock core bit size
N · Blows for last 12 in. of 18-in. driveN60 = N × ER/60 (ER = hammer energy ratio, %)50/3″ · 50 blows for 3 in. penetration (refusal)
REC · Core recovery; RQD per ASTM D6032w · Moisture (D2216); LL/PI (D4318); −200 (D1140)Consol. (D2435); UU (D2850); PLT (D5731)
Notes
  1. Stratification lines are approximate; transitions between soil types may be gradual.
  2. Soil descriptions are based on visual-manual classification (ASTM D2488), revised where laboratory results are available (ASTM D2487).
  3. Groundwater levels are for the date(s) shown and will vary with season, rainfall and drainage.
  4. This log is not complete without the accompanying geotechnical report and should not be used separately from it.
Logged byChecked byApproved by (P.E.) / license no. / state
P.E. SEAL
Boring B-1 · Appendix A — Boring Log TemplateRailway Ground Hazard Risk Management · Geotechnical EngineeringSheet ___ of ___